Transmission Grid Code
Name (orig) | Pravila o radu prenosnog sistema |
---|---|
Name (English) | Rules on the Operation of the Transmission System |
Full name | Pravila o radu prenosnog sistema (Službeni Glasnik RS, broj 91/2015) |
Entry into force | 01.10.2015 |
Purpose | This provision regulates the planning of the transmission system, the connection and access of power plants to it, the operation and maintenance of the transmission system facilities and the measurement of electricity. |
Relevance for renewable energy | The Rules on the Operation of the Transmission System define important rules and obligations for different power production capacities connected to the transmission system, including renewable energy sources. |