Grid Access Cost Methodology

Updated: 24.01.2019

Name (orig)

Metodologija za određivanje troškova priključenja na sistem za prenos i distribuciju električne energije

Name (English)

Methodology for Setting the Costs of Connection to the Electricity Transmission and Distribution System

Full name

Metodologija za određivanje troškova priključenja na sistem za prenos i distribuciju električne energije (Službeni Glasnik RS, br. 109/15)

Entry into force

18.12.2015

Purpose

This Methodology determines the method and detailed criteria for the calculation of the connection costs depending on criteria such as the approved capacity, the connection point, the need for necessary equipment installations etc.

Relevance for renewable energy

The methodology for calculation of the connection costs also apply to renewable energy facilities.