Grid issues in Italy

PDF

Updated: 07.02.2019

Author: Jasmin Schwarz

Summary of grid issues

Connection to the grid

Plant operators are contractually entitled against the grid operator to priority connection of a renewable energy plant. The grid operator is obliged to conclude this contract. 

Use of the grid

Plant operators are contractually entitled to the use of the grid. Electricity from renewable sources shall be granted priority use of the grids, provided that the electricity achieves the same price on the market and the security of the national energy grid can be guaranteed.

Grid development

A plant operator applying for connection is contractually entitled against the grid operator to a grid expansion, if the expansion is necessary for connecting the plant to the grid. As renewable energy plants must be given priority connection, a grid expansion necessary to connect such a plant must also be given priority.

Statutory provisions

  • ARG/elt 199/11 (Delibera n. 199/11. Testo integrato delle disposizioni dell’Autorità per l’energia elettrica e il gas per l’erogazione dei servizi di trasmissione, distribuzione e misura dell’energia elettrica per il periodo di regolazione 2012-2015 e disposizioni in materia di condizioni economiche per l’erogazione del servizio di connessione – Resolution on the Transmission and Distribution of Electricity) 
  • DL 387/03 (Decreto Legislativo 29 dicembre 2003, n. 387. Attuazione della direttiva 2001/77/CE relativa alla promozione dell'energia elettrica prodotta da fonti energetiche rinnovabili nel mercato interno dell'elettricità – Decree for the Promotion of Renewable Energy) 
  • AEEG 111/06 (Delibera n. 111/06 Condizioni per l’erogazione del pubblico servizio di dispacciamento dell’energia elettrica sul territorio nazionale – Resolution on the Dispatch of Electricity on the National Level) 
  • ARG/elt 5/10 (Deliberazione 25 gennaio 2010. Condizioni per il dispacciamento dell’energia elettrica prodotta da fonti rinnovabili non programmabili – Resolution on Dispatch Conditions for Renewable Energy) 
  • ARG/elt 99/08 (Deliberazione 23 luglio 2008 - ARG/elt 99/08. Testo integrato delle condizioni tecniche ed economiche per la connessione alle reti elettriche – Resolution on the Terms and Conditions for Access to the Grid) 
  • ARG/elt 123/08 (Delibera ARG/elt 123/08. Procedura per la risoluzione delle controversie tra produttori e gestori di rete – Resolution on the Settlement of Disputes Between Producers and Grid Operators)
  • Terna Network Code (Codice di Rete Terna)

Italy

Further information

  • Autorità di Regolazione per Energia, Reti e Ambiente (ARERA) - Regulatory Authority for Energy, Grids and Environment (ARERA)
  • +392655651
  • website
  • info(at)arera.it