Connection to the grid
Updated: 05.01.2019
Plant operators are contractually entitled to connection to the grid by the grid operator. The grid operator is obliged to enter into the bilateral connection agreements (sec. 16 par. 1 EA 1989 in conjunction with sec. 1.3 CUSC).
A claim for connection arises on the date on which a given connection agreement is concluded (sec. 1.3 CUSC).
Entitled party. The persons entitled are the plant operators.
Obligated party. The person obligated is the grid operator in charge (sec. 16 par.1 EA 1989 in conjunction with sec. 1.3 CUSC).
Procedure
Process flow | Plant operators are contractually entitled to connection to the grid by the grid operator. The grid operator is obliged to enter into the bilateral connection agreements (sec. 16 par. 1 EA 1989 in conjunction with sec. 1.3 CUSC). A claim for connection arises on the date on which a given connection agreement is concluded (sec. 1.3 in conjunction with Schedule 2 Exhibit 1 CUSC). |
---|---|
Deadlines | Time limits on connection depend on the terms of a given connection and construction agreements (sec. 2.13.4 in conjunction with Schedule 2 Exhibits 1 and 3 CUSC). |