Promotion in Austria

PDF

Updated: 18.12.2018

Author: Tim Sternkopf

Summary of support schemes

• Feed-in tariff. In Austria, electricity from renewable sources is supported mainly through a feed-in tariff, which is set out in the Ökostromgesetz (ÖSG) 2012 and the regulations related thereto. The operators of renewable energy plants are entitled against the government purchasing agency, the so-called Abwicklungsstelle für Ökostrom AG (hereinafter called "Clearing and Settlement Agency"), to the conclusion of a contract on the purchase of the electricity they produce ("obligation to enter into a contract") unless the promotional volume for the FiT is exhausted.

• Successive rate to the feed-in tariff for biogas plants. In July 2017, in the framework of the revision of the ÖSG, the Federal Government introduced a successive rate for highly efficient biogas plants. The operators of eligible plants are entitled to receive an efficiency-dependent tariff for up to 5 years.

• Subsidy I. The construction of small and medium-sized hydro-electric power stations is subsidised by investment grants. The legal basis of these grants is the ÖSG 2012 in conjunction with the applicable annual subsidy directive.

• Subsidy II. Subsidies granted for PV installations on rooftops and building-integrated installations with a capacity of 5-200 kW.

• Subsidy III. An investment subsidy is granted for off-grid installations that generate electricity from renewable energy sources.

• Subsidy IV. Subsidies granted for PV installations on facilities in the agriculture and forestry sector with a capacity of 5-100 kW.

Technologies

All renewable electricity generation technologies are eligible for the Austrian feed-in tariff. In contrast to the tariff, investment grants are available for small and medium-sized hydro-electric power stations and small PV installations only.

Statutory provisions

 

• ÖSG 2012 (Ökostromgesetz; Bundesgesetz, mit dem Neuregelungen auf dem Gebiet der Elektrizitätserzeugung aus Erneuerbaren Energieträgern und auf dem Gebiet der Kraft-Wärme-Kopplung erlassen werden - Federal Act on the Support of Electricity Produced from Renewable Energy Sources and on Combined Heat and Power)

• ÖSET-VO 2018 (Ökostrom-Einspeisetarifverordnung; Verordnung des Bundesministers für Wissenschaft, Forschung und Wirtschaft, mit der die Einspeisetarife für die Abnahme elektrischer Energie aus Ökostromanlagen auf Grund von Verträgen festgesetzt werden, zu deren Abschluss die Ökostromabwicklungsstelle ab 1. Jänner 2018 bis Ende des Jahres 2019 verpflichtet ist – Feed-in tariff regulation 2018; Regulation of the Federal Ministry for Science, Research and Economy determining the feed-in tariffs for the purchase of electricity from renewable energy plants on the basis of contracts to whose conclusion the Clearing and Settlement Agency is obligated from 1 January 2018 until the end of 2019)

• Subsidy Directive 2018 (Förderungsrichtlinien 2018 für die Gewährung von Investitionszuschüssen gemäß § 24, § 26 und § 27 Ökostromgesetz 2012 für die Errichtung von Kleinwasserkraftanlagen und mittleren Wasserkraftwerken sowie § 7 KWK-Gesetz zur Errichtung und Erneuerung von KWK-Anlagen - Subsidy Directive 2018 on the granting of investment subsidies, as set out in § 24, § 26 and § 27 of the ÖSG 2012, for the construction of small and medium-sized hydro-power plants and §7 of the CHP-Act on the construction and renovation of CHP plants)

• NFTVO 2017 (Biogas-Nachfolgetarifverordnung 2017; Verordnung des Bundesministers für Wissenschaft, Forschung und Wirtschaft, mit der die Nachfolgetarife für die Abnahme elektrischer Energie aus Ökostromanlagen auf Basis von Biogas festgesetzt werden – Biogas successive rate ordinance 2017 – Regulation of the Ministry for Science, Research and Economy which determines the successive rate to the feed-in tariff for renewable electricity plants based on biogas technology)

• Compensatory charge regulation 2017 (Ökostromförderbeitragsverordnung 2017; Verordnung des Bundesministers für Wissenschaft, Forschung und Wirtschaft, mit der der Förderbeitrag für Ökostrom für das Kalenderjahr 2017 bestimmt wird – Regulation of the the Ministry for Science, Research and Economy which defines the compensatory charge for electricity from RES for 2017)

• Regulation on fixed charges (Verordnung des Bundesministers für Wissenschaft, Forschung und Wirtschaft, mit der die Ökostromförderbeitragsverordnung 2015 und die Ökostrompauschale Verordnung 2015-2017 erlassen werden – Regulation of the Ministry for Science, Research and Economy which enacts the compensatory payment regulation 2015 and the regulation on the fixed charge on electricity from renewable energy sources 2015-2017)

• Offgrid subsidy guidelines 2015 (Infoblatt zur Antragstellung für die Stromerzeugung in Insellage auf Basis erneuerbarer Energieträger – Guidelines for the offgrid investment subsidy scheme)

• UFG (Umweltförderungsgesetz – Environmental Aid Act)

• CHP-Act (KWK-Gesetz; Bundesgesetz, mit dem Bestimmungen auf dem Gebiet der Kraft-Wärme-Kopplung neu erlassen werden – Federal Act introducing new conditions for combined heat and power)

• PV Subsidy Guidelines 2018 (Leitfaden Photovoltaik-Anlagen 2017. Eine Förderaktion des Klima- und Energiefonds der österreichischen Bundesregierung – Subsidy guidelines for photovoltaic installations 2017. A Support campaign of the Austrian climate and energy funds)

• AF subsidy guidelines 2017 (Leitfaden Photovoltaik-Anlagen in der Land- und Forstwirtschaft 2017. Eine Förderaktion des Klima- und Energiefonds der österreichischen Bundesregierung – Subsidy guidelines for photovoltaic installations in agriculture and forestry 2017. Support campaign of the Austrian climate and energy funds)

Austria