Grid issues in Turkey
Updated: 23.01.2019
Provisions in detail
Summary of grid issues
Connection to the grid | In Turkey, the connection to the grid occurs through a bidding procedure. The available connection regions and points are published by TEIAS on annual basis every 31 March of the year. A plant operator who wants to be connected to the grid needs a production license, clarify the connection details and arrange an agreement of the connection with TEIAS. |
---|---|