Grid development
Updated: 06.02.2019
General development of the grid. Plant operators are not entitled to develop the grid. The grid operator has the general obligation to develop the grid (art. 30 DL 29/2006 amended by L 42/2016).
Entitled party. Although RES-E producers are entitled against the grid operator to the connection of their plants, they are not entitled to the development of the grid (art. 12 DL 215-A/2012).
Obligated party. The grid operator is not legally required to develop the grid. However, he has the general obligation to develop the grid when it is required for the connection of RES-E plants (art. 30 DL 29/2006 amended by L 42/2016)