Grid issues in Montenegro

PDF

Updated: 23.01.2019

Author: Ivana Naydenova

Provisions in detail

Summary of grid issues

Connection to the grid

All RES-plant operators are entitled to connection, if they meet all the requirements set out in the grid issue related provisions. The system user therefore mainly needs to obtain the consent of the grid operator and to conclude a contract for connection.

Statutory provisions

  • Energy Law
  • Market Rules
  • Transmission Grid Code
  • Transmission Grid Methodology
  • Distribution Grid Code
  • Distribution Grid Methodology

Montenegro

Further information

  • Crnogorski elektroprenosni sistem AD (CGES) – Montenegrin Transmission System Operator
  • +382 20/40 76-82
  • CGES website
  • Crnogorski operator tržišta električne energije d.o.o. (COTEE) – Electricity Market Operator of Montenegro
  • +382 20/22 37 03
  • Operator website
  • info(at)cotee.me