Grid issues in Estonia
Updated: 17.01.2019
Provisions in detail
Summary of grid issues
Connection to the grid | On request, the grid operator is obliged to the plant operator to connect plants within his area of responsibility as soon as they comply with the technical requirements. The connection of plants shall be based on non-discriminatory criteria. The costs arising from the connection of a plant to the grid are borne by the plant operator. |
---|---|
Use of the grid | The grid operator is statutorily obligated to transmit via his grid the electricity generated and sold by the plant operators on the basis of non-discriminatory criteria. The grid use costs are borne by the electricity buyer. |
Grid development | The grid operator is statutorily obliged to expand the grid within his area of responsibility to ensure that it meets the required standards. Moreover, a plant operator may demand that the grid operator upgrade the grid if the upgrade is necessary to connect a plant. The costs of such an upgrade shall be borne by the operator of the plant in question. |
Statutory provisions |
|