Premium tariff (Law on the Promotion of Renewable Energy)
Updated: 04.01.2019
Author: Karl Wikberg
Denmark promotes renewable electricity generation through a premium tariff. Plant operators receive a variable bonus on top of the market price. The sum of the bonus and the market price shall not exceed a certain statutory maximum, which depends on the date of connection of a given plant and the source of energy used. In certain cases, plant operators are granted a guaranteed bonus on top of the market price. In such cases the maximum is not defined by law.
Eligible technologies
The Law on the Promotion of Renewable Energy promotes all technologies except for geothermal power generation (§ 2 par. 2 VE-Lov).
Wind energy | Both on-shore and off-shore plants are eligible (§§ 35 a-43 VE-Lov). Premium tariffs for off-shore wind parks are awarded through tenders (See: Tenders). |
---|---|
Solar energy | Eligible (§§ 47 VE-Lov). |
Biogas | Eligible (§§ 43a – 43e VE-Lov). |
Hydro-power | Eligible under the following conditions (§§ 47 VE-Lov):
|
Biomass | Eligible (§§ 44-46 VE-Lov). |
Amount
- Maximum bonus: The bonus varies according to the market price and the statutory maximum set for the sum of both the market price and the bonus.
- Guaranteed bonus: In certain cases, plant operators are granted a guaranteed bonus on top of the market price. In such cases the maximum is not defined by law (§§ 36-48 VE-Lov).
Wind energy | On-shore plants commissioned between 01.01.2014 and 20.02.2018 off-shore wind turbines outside tenders:
Off-shore plants:
For plants with an installed capacity of up to 25 kW that generate electricity for the operator's own use, the Danish Ministry of Energy, Utilities and Climate may prior to the launch of a project grant commitments in tariff in 2016 for electricity from wind turbines that are connected to their own consumption installation. The commitment will be granted within a pool is 1 MW (§ 41 par. 4 VE Lov). The maximum subsidy (bonus plus market price) depends on the total installed capacity of the plant:
|
---|---|
Solar energy | The Danish Ministry of Energy, Utilities and Climate may grant support for electricity produced in PV-installation for a pool of 20 MW per year from 2013 until 2017. In 2016 and 2017 only PV-installations with installed capacity of less than 500 kW are eligible. For projects where the decision on commitment for tariff was met on 01.01.2017 or later, the total aid per project may not exceed an amount equivalent to € 15 million (§ 47 par. 8 VE Lov). Following installations may receive the support (§ 47 par. 7 VE Lov):
|
Biogas | Plants using pure biogas or gas from gasification: maximum subsidy (bonus plus market price): 0.793 DKK (approx. €ct 11) per kWh (§ 43a par. 2 VE-Lov). The tariff is net-price indexed. It is calculated every year on 1 January and based on 60% of the increase in the net price index of the previous year as compared to 2007 (§ 43a par. 6 VE-Lov). Additionally, the operator receives a guaranteed bonus of:
The plant operator may choose between maximum subsidy (bonus plus market price): 0.793 DKK (approx. €ct 11) per kWh and a guaranteed bonus of 0.431 DKK (approx. €ct 6) per kWh. This decision is then binding for at least one calendar year after the change. The application for the change of support must be submitted until 1st October to take effect from the end of the year (§ 43a par. 4 VE-Lov). For projects where the decision on commitment for tariff was met on 01.01.2017 or later, the total aid per project may not exceed an amount equivalent to € 15 million (§ 43a par. 8 VE Lov). The operators of plants with an installed capacity of up to 6 kW, which were connected to the grid on 20.11.2012 or later, can choose between maximum subsidy (bonus plus market price): 0.793 DKK (approx. €ct 11) per kWh and maximum subsidy (bonus plus market price) of 1.30 DKK (approx. €ct 17) per kWh, applicable for 10 years after the grid connection. For plants connected on or after 01.01.2014 the bonus will reduce annually by 0.14 DKK (€ct 2) until 01.01.2018. Request for choice of price supplements must be filed simultaneously with plant’s grid connection (§ 43a par.7 VE-Lov). For installations connected to the grid on 01.01.2016 or later, the choice of the support is conditional on approval by Danish Ministry of Energy, Utilities and Climate before commencement of the project (§ 43a par.8 VE Lov). Co-firing: for the proportion of electricity generated from the combustion of biogas: guaranteed bonus of 0.431 DKK (approx. €ct 5.8) per kWh (§ 43a par. 3 and 5 VE-Lov). The tariff is net-price indexed. It is calculated every year on 1 January and based on 60% of the increase in the net price index of the previous year as compared to 2007 (§ 43a par. 6 VE-Lov). Additionally, the operator receives a guaranteed bonus of:
The plant operator may choose between maximum subsidy (bonus plus market price): 0.793 DKK (approx. €ct 11) per kWh and a guaranteed bonus of 0.431 DKK (approx. €ct 5.8) per kWh. This decision is then binding for at least one calendar year after the change. The application for the change of support must be submitted until 1st October to take effect from the end of the year (§ 43a par. 4 VE-Lov). |
Hydro-power | Guaranteed bonus of 0.10 DKK (approx. €ct 1) per kWh, applicable for 20 years from the date of connection of the plant (§ 47 par. 9 no. 3 VE-Lov). For installations connected to the grid on 01.01.2016 or later the installed capacity must be less than 500 kW and the granting of the support is conditional on approval by Danish Ministry of Energy, Utilities and Climate before commencement of the project (§ 47 par. 10 VE-Lov). For projects where the decision on commitment for tariff was met on 01.01.2017 or later, the total aid per project may not exceed an amount equivalent to € 15 million (§ 47 par. 10 VE Lov). Plants deemed to be of strategic importance by the ministry in charge (currently, only wave energy comes under this definition): For installations connected to the grid on 01.01.2016 or later the installed capacity must be less than 500 kW and the granting of the support is conditional on approval by Danish Ministry of Energy, Utilities and Climate before commencement of the project (§ 47 par. 10 VE-Lov). For projects where the decision on commitment for tariff was met on 01.01.2017 or later, the total aid per project may not exceed an amount equivalent to € 15 million (§ 47 par. 10 VE Lov). Following support is available:
|
Biomass | The operators of plants producing electricity with usage of stirling engines and other special power generation plants with biomass as an energy source, with an installed capacity of up to 6 kW, which were connected to the grid on 20.11.2012 or later, can choose between maximum subsidy (bonus plus market price): 0.793 DKK (approx. €ct 11) per kWh and maximum subsidy (bonus plus market price) of 1.30 DKK (approx. €ct 17) per kWh, applicable for 10 years after the grid connection. For plants connected on or after 01.01.2014 the bonus will reduce annually by 0.14 DKK (€ct 2) until 01.01.2018 (§ 44 par.2 VE-Lov). For installations connected to the grid on 01.01.2016 or later, the choice of the support is conditional on approval by Danish Ministry of Energy, Utilities and Climate before commencement of the project (§ 44 par.3 VE-Lov). However, for projects where the decision on commitment for tariff was met on 01.01.2017 or later, the total aid per project may not exceed an amount equivalent to € 15 million (§ 44 par.3 VE-Lov). |
Addressees
The persons entitled to the payment of a bonus are the owners of plants for the generation of electricity from renewable sources (§ 56 par. 2 VE-Lov).
Procedure
Process flow | Entitlement to bonus payments arises from statutory law (§ 35a-47 VE-Lov). |
---|---|
Competent authority | The authority obligated to pay the bonus is the Danish Ministry of Energy, Utilities and Climate (§ 56 par. 1 VE-Lov). |
Degression
The Law on the Promotion of Renewable Energy stipulates several terms for degression of support amount.
Solar energy | A degression of support amount is foreseen. For more detailed information, see the Amount section. |
---|---|
Biogas | An adjustment of support amount is foreseen depending on the price of the natural gas in a previous year. For more detailed information, see the Amount section. |
Hydro-power | A degression of support amount is foreseen. For more detailed information, see the Amount section. |
Biomass | A degression of support amount is foreseen. For more detailed information, see the Amount section. |
Eligibility period
The Law on the Promotion of Renewable Energy stipulates several terms and deadlines, which depend on the technology used and the date of commissioning of the plant in question. For more detailed information, see the Amount section.
Distribution of costs
Consumers | The costs of the support system are borne by the consumers (§ 8 par. 2 Electricity Supply Act). |
---|---|
Distribution mechanism |
|