General Electricity Supply Conditions
| Name (orig) | Opći uvjeti za opskrbu električnom energijom |
|---|---|
| Name (English) | General Conditions for the Supply of Electric Energy (Official Gazette, no. 14/06) |
| Full name | Opći uvjeti za opskrbu električnom energijom, Narodne Novine, br. (14/06) |
| Entry into force | 16.02.2006 |
| Purpose | The Document defines the conditions for the supply of electric energy, which include: • The procedure for the issue of preliminary authorisation of grid connection; • The contractual process for the connection agreement; • The conditions for connection, electricity supply and use of the network; • The quality of electricity supply; • Mutual contractual agreements between energy producers and network operators; • The rights and duties of the energy operators and network users. |
| Relevance for renewable energy | The rules set out in the Document apply to RES-E producing power plants and conventional power plants likewise. |
