Brussels: Subsidy (Aide à l'investissement)

Updated: 08.02.2019

Author: Stijn Anciaux

Within the bounds of its available budget, the Brussels-Capital provides investment assistance for companies which develop environmental projects, including investments in renewable energy systems.

Eligible technologies

Eligible are investments in heat pumps for the production of heat as well as biogas and biomass CHP and trigeneration plants for the production of heating, cooling and electricity (Art. 4 Arrêté du 2 avril 2009). The eligible investment amount also includes freight, installation and assembly charges (Art. 6 Arrêté du 2 avril 2009). Moreover, the eligible investment shall amount to at least 7,500 EUR and shall concern investments planned within the Brussels-Capital region (Art. 8-9 Arrêté du 2 avril 2009).

Biogas

Investments in biogas CHP and trigeneration plants are eligible under the following condition (Annex 2, Arrêté du 2 avril 2009):

  • The CO2 savings of the plant shall amount to at least 5 % compared with conventional installations producing separately heating cooling and electricity.

Biomass

Investments in biomass CHP and trigeneration plants are eligible under the following condition (Annex 2, Arrêté du 2 avril 2009):

  • The CO2 savings of the plant shall amount to at least 5 % compared with conventional installations producing separately heating cooling and electricity.

Geothermal energy

Investments in heat pumps are eligible under the following conditions (Annex 2, Arrêté du 2 avril 2009):

  • The coefficient of performance (COP) of the installation shall meet the requirements of the European standards EN 14511 or EN 255 and shall be conform to the latest version of the European Eco-label.
  • The efficiency of the heat pump shall be testified and reported by an independent organization. The producer of the heat pump shall make the report available.

Amount

The amount of the investment assistance depends on the size of the company (Art. 24 Arrêté du 2 avril 2009):

  • Micro and small entreprises: 40 % of the eligible costs 
  • Medium entreprises: 40 % of the eligible costs
  • Large entreprises: 20 % of the eligible costs
Moreover, the subsidy can be increased by 5 % if the company is certified Emas, ISO 14.000 or "eco-dynamic entreprise" (Art. 26 Arrêté du 2 avril 2009).  The amount of the investment assistance cannot exceed € 80,000 per company and per calendar year (Art. 22 Arrêté du 2 avril 2009).

Addressees

Industrial, commercial and service sector companies as well as companies of other sectors as listed in Art. 3 §1 Arrêté du 2 avril 2009 are entitled to the investment assistance.

Procedure

Process flow

    • First of all, the entitled company shall submit a preliminary application form to the administration together with the necessary documents (Art. 30 Arrêté du 2 avril 2009)
    • The applicant shall submit a grant application within 120 days following the receipt of the validation of the preliminary application (Art. 31 Arrêté du 2 avril 2009)
    • The applicant shall submit its investment programme within 12 months following the allocation acceptation of the administration (Art. 32 Arrêté du 2 avril 2009)

    Competent authority

    The competent authority is the Economy and Employment Administration of the Brussels-Capital region (Administration de l'Economie et de l'Emploi du Ministère de la Région de Bruxelles-Capitale) (Art.1 Arrêté du 2 avril 2009)

    Distribution of costs

    State

    The energy subsidies are directly financed by the budget of the Brussels-Capital region.

    Belgium

    Further information

    • Ministère de la Région de Bruxelles-Capitale, Administration de l'Economie et de l'Emploi (AEE) – Economy and Employment Administration of the Brussels-Capital region
    • +32 28 00 34 52
    • AEE website
    • info.eco(at)mrbc.irisnet.be

    Basic information on legal sources